Improve the bioretention site's soil structure and enhance plant health to ensure the proper capture and treatment of stormwater runoff.
-
September - November 2023 (Completed)
-
< 1 ac.
-
• Soil texture consists of at least 60% sand, a standard growing medium for these types of installations. Sand has poor water-holding capacity, which can result in overall plant stress.
• The distribution of the treatments presented challenging logistics, given that the bioretention cells are divided into five sections and located in one of the busiest streets of Vancouver.
-
Still to be determined. We will evaluate the impact of the treatments in spring 2024.
-
Still to be determined.
-
• Field observations
• Initial testing of the soil biological community using our Core Package Analysis.